Tidemaster, have supplied and installed the new floating pontoons and ramps, while Doug Jack and a small band of volunteers are adding power and water, with the aim of having stage one of the marina rejuvenation project completed before Opening Day. ... Fetch This Document
561 ENGINEERING 12MAY2010-ADOPTED REPORT
Adopted Report of the Engineering Services Committee Meeting held Wednesday, 12 May 2010 at CONSTRUCTION OF PONTOONS 3 ES FN334/375/01(P6) 16 2009/2010 CAPITAL WORKS PROGRAMME (t/a Tidemaster Docking Systems) ... Get Content Here